Ginger HPC and the IQ Towers of Hamburg’s HafenCity

Building in the Heart of Hamburg

Anyone visiting the heart of Hamburg – HafenCity – usually looks at the impressive new and historic buildings or out across the wide water. Yet it is also worth taking a look at the ground beneath. Only those who understand the subsoil can successfully build in a harbour environment shaped by sand, storm surges and occasional water ingress.

Hamburg’s HafenCity is a place of superlatives. It is the largest urban development project in a European city centre, and only a few comparable projects exist worldwide. By 2025, residential and office space will be created here on an area of around 157 hectares. The district will also provide space for shops, schools and even a university.

In the heart of this new quarter, directly next to HafenCity University, three striking buildings were completed in 2017: the IQ Towers. The most prominent of them is the 70-metre-high office tower, which features not only 18 upper floors but also two basement levels. All three buildings are connected by a two-storey underground car park – a particular challenge on a harbour site. In addition, the U4 underground line runs directly beneath the underground parking structure. Located close to the mouth of the Elbe River, the construction works were also exposed to tidal influences and potential storm surges.

As a result, major challenges had to be addressed even before construction began: how could the excavation pit be secured and kept dry?

Stefan Reich, head of the Hamburg branch of HPC, took on this task together with his team. The civil engineer has more than 30 years of experience in building critical infrastructure next to – and sometimes even within – water. Together with his team, he develops concepts for island sewage treatment plants, flood protection systems, bridges and naval facilities.

A Trained Eye Meets the Riverbed

On behalf of the client, ECE Projektmanagement GmbH & Co. KG, HPC AG carried out geotechnical, hydrogeological and waste-management investigations and planning. The HPC specialists found hardly any contaminants. This is mainly due to the site’s particular history. Until the end of the 19th century, the area was part of the harbour basin of the former timber port. When the basin was no longer required and additional storage space was needed, it was simply filled with clean sand and enclosed by quay walls. The reclaimed harbour land was subsequently developed with sheds and warehouses and used for cargo handling and storage until the 1990s. As a result, any contamination remained largely limited to near-surface layers.

The results of the soil and groundwater investigations reflected this history. By analysing historical boreholes and cone penetration tests, the investigation team determined that the subsoil consists of loose sand down to a depth of around ten metres, underlain by organic material and silt layers from the former harbour floor.

The IQ Towers: Built on Sand – Yet Secure

At this location, the difference between high and low tide normally exceeds 3.6 metres. Several times a year, storm surges can further raise these tidal high-water levels.

This meant that within a confined construction site, and under the influence of ebb, flood and potential storm surges, the excavation pit had to be secured and kept dry in order to construct the foundations of the buildings. To prevent groundwater from breaking through the base of the excavation pit, automatically controlled wells were installed. At the same time, neither too much nor too little water could be pumped out. The required pumping volume had been calculated in advance by HPC.

Auftraggeber:
ECE Projektmanagement GmbH & Co. KG
Projektbeginn:
Gen 2017
Projektdauer:
by 2025
Projektstandort:
Hamburg, Germany
Fläche:
157 Hectar

November Storm Surge 2015: Water Ingress and Rapid Response

Tourists often see only the beauty of the harbour. Residents of Hamburg also know the challenges posed by the river, which is regularly affected by storm surges. The storm surge season lasts from 15 September to 31 March of the following year. The Port of Hamburg is explicitly classified as a vulnerable area. Consequently, storm surge protection is mandatory – and such protection was also designed and implemented for the IQ Towers. HPC advised the contractor BAM on the development of an effective protection system consisting of waterproof-wrapped sand-filled big bags, filter mats, toe filters, surcharge bodies and slope stabilization measures.

However, reliable storm surge protection cannot simply be planned and installed once and then left unattended. On the morning of 30 November, during a storm surge event, the construction company discovered a small leak behind a quay wall within the excavation pit. Initially, it was considered relatively harmless and temporarily sealed with a plug. Stefan Reich visited the site the same day and quickly realised that the weak point was highly dangerous – especially during storm surge season. During the second storm surge, which coincided with the evening high tide, significantly more water began to escape. The Elbe’s water threatened to erode the surrounding soil and potentially breach the quay wall.

Designed Long-Term Protection

The HPC team responded that very night. The leaking area was secured against erosion using a large surcharge filter made of gravel placed on a geotextile base. Its weight also helped stabilize the point of water ingress. Construction work only had to be briefly interrupted over the following days in order to pump out the water that had already entered the excavation pit. Afterwards, HPC developed a long-term stabilization concept for the weak point to ensure its safety after the buildings were completed.

Subsequent investigations showed that the excavation pit protection system had been fully intact prior to the incident. However, it turned out that the sheet-pile wall along the riverbank itself contained a previously unknown leak through which the rising Elbe water could enter unhindered. Once again, the incident demonstrated how crucial monitoring and practical experience are in dealing with the storm surges of northern Germany.

Today, the buildings have long been completed, and the underground railway continues its regular service beneath them without interruption. From the upper floors of the IQ Towers, visitors enjoy an impressive view over Hamburg’s harbour and the Elbphilharmonie. Only a few subway passengers, residents or visitors realise how much expertise and experience were required to develop this site. Anyone familiar with the work carried out by the Hamburg-based HPC team will view this remarkable corner of HafenCity from a very different perspective.

Denser, load-bearing sand layers begin only at a depth of about 13 meters. To determine how ebb and flood tides affect the groundwater within the construction ground, the HPC field team equipped monitoring wells with data loggers. These recorded the changing water levels continuously over several months. Using this data, HPC engineers developed hydrological models linking the expected groundwater levels in the excavation pit with the tide-dependent water levels of the Elbe River. Based on the various analyses and models, the HPC team was able to advise the client on geotechnical aspects and cost estimates. During the subsequent implementation of the project, HPC was also commissioned by the general contractor, BAM Deutschland AG, to closely supervise all geotechnical works and to take on the role of flood protection officer.

The buildings have long since been completed, and the subway continues its regular service beneath them without interruption. From the upper floors of the IQ Towers, there is a magnificent view over Hamburg’s harbour and the Elbphilharmonie. Only a few subway passengers, residents, or visitors realize how much expertise and experience were required to develop this site. Anyone familiar with the work of the Hamburg-based HPC team will certainly look at this impressive corner of HafenCity with a different perspective.

Erdverkabelung: Ginger HPC als Advokat des Bodens und der bauausführenden Unternehmen

Die Dringlichkeit des Netzausbaus, um die Energiewende voranzubringen, ist auch durch den Ukraine-Krieg offensichtlich geworden. Proteste von Anwohner:innen erregen regelmäßig…
Learn more

Underground cabling: Ginger HPC as an advocate for soil and construction companies

The urgency of grid expansion to drive the energy transition has become particularly evident due to the Ukraine war. While…
Learn more

Erdverkabelung: Ginger HPC als Advokat des Bodens und der bauausführenden Unternehmen

Die Dringlichkeit des Netzausbaus, um die Energiewende voranzubringen, ist auch durch den Ukraine-Krieg offensichtlich geworden. Proteste von Anwohner:innen erregen regelmäßig…
Learn more

Bauen in doppelter Wasserlage

Kita am Baakenhafen Die Hamburger HafenCity ist eines der eindrucksvollsten Bauprojekte in Hamburg: Entlang der Elbe entsteht hier seit 2001…
Learn more

Building between two water levels

Hamburg’s HafenCity is one of the most impressive urban development projects in the city: since 2001, an entirely new district…
Learn more

Bauen in doppelter Wasserlage

Die Hamburger HafenCity ist eines der eindrucksvollsten Bauprojekte in Hamburg: Entlang der Elbe entsteht hier seit 2001 ein komplett neuer…
Learn more

Dem Wasser gefolgt: Generalentwässerungsplan für Meerbusch

Neues Entwässerungskonzept für Meerbusch-Strümp Der Auftrag war klar: Der inzwischen 20 Jahre alte Generalentwässerungsplan sollte aktualisiert werden. Neu waren nicht…
Learn more

Following the water: General drainage plan for Meerbusch

The task was clear: the general drainage plan, now 20 years old, needed to be updated. Not only were there…
Learn more

Dem Wasser gefolgt: Generalentwässerungsplan für Meerbusch

Der Auftrag war klar: Der inzwischen 20 Jahre alte Generalentwässerungsplan sollte aktualisiert werden. Neu waren nicht nur diverse Baumaßnahmen oder…
Learn more

In-situ: Wie von Zauberhand entfernt

Biologisch-chemische In-situ-Sanierung von LHKW Leichtflüchtige halogenierte Kohlenwasserstoffe sind nur schwer aus dem Boden zu entfernen. Bernadette Bohnert und ihr Team…
Learn more

In-situ: Removed as if by magic

Volatile halogenated hydrocarbons are difficult to remove from soil. Bernadette Bohnert and her team used an innovative method for contaminant…
Learn more

In-situ: Wie von Zauberhand entfernt

Leichtflüchtige halogenierte Kohlenwasserstoffe sind nur schwer aus dem Boden zu entfernen. Bernadette Bohnert und ihr Team nutzten für die Schadstoffsanierung…
Learn more

I Vostri vantaggi con GINGER HPC

Più di 75 anni di esperienza

Dal 1948 GINGER HPC unisce competenza e precisione in progetti ambientali e ingegneristici per soluzioni affidabili che durano nel tempo.

Forte rete internazionale

Con sedi in tutta Europa come parte del gruppo Ginger e membro fondatore della Inogen Alliance uniamo prospettive globali a competenze locali in ogni progetto.

Eccellente sostenibilità

Dalle certificazioni internazionali ai premi di settore i nostri riconoscimenti rappresentano precisione ingegneristica standard elevati e un continuo impegno per l’innovazione.

Unsere Leistungsbereiche

No child pages found for the selected parent.

Gestalten Sie schon heute die Welt von morgen mit

Haben Sie Lust auf Kolleg:innen in Ihrer Arbeitsumgebung, die mit Leidenschaft und hoher Qualifikation in Projekten arbeiten?

Sie mögen es, langfristige Kund:innen-Partnerschaften aufzubauen und sich in immer neuen Projekten weiterzuentwickeln? Sie sind gerne dazu bereit, Ihren Kund:innen den bestmöglichen Service zu bieten?

Dann sollten wir uns kennenlernen, denn wir suchen Sie zur Verstärkung unseres GINGER HPC-Teams.

Jetzt bewerben
Consenso ai cookie con Real Cookie Banner